Skip to content Client loginLogin
Speak to Ara 07861 914 115
Book a Site Visit Call David 07762 240783

Battery storage for architects

A mirror-clad pergola on a country-house lawn with a BYD battery system inside
The mirrored pergola, second view
←
For architects

Plant, as a design decision.

A megawatt-hour of BYD storage, a Pratic pergola, one footprint on the lawn. Scroll to walk around it.

Mirror-clad plant bay

A plant room you would put on the lawn on purpose.

Two BYD cabinets and a PCS behind sliding mirror glass. 1 MWh in the footprint of two parking bays; the louvred roof breathes for the batteries.

RIBA Stage 0 to 7 · one power partner

Bring us the scheme. We bring the power.

Book a Zero Fee Site Visit on any live scheme — or a call back to go through it with you.

Scroll · walk around

Questions day or night? Call Ara, our AI assistant – she knows all about our battery storage and systems: 07861 914 115 or 01727 326 026

West Court Retreat country-house hotel
Hotel & spa · 2 MWh West Court Retreat — the largest Victron system in the UK
Looking down the central aisle of a prefabricated plant room: Victron inverters and BYD battery towers either side, orange DC cabling on tray, lit from above
Inside the energy centre Two walls of Victron, one aisle, every cable on show
A mirror-clad pergola plant room on a country-house lawn: a row of Victron inverters over BYD battery towers, hedges and lavender either side
Prefabricated plant room An energy centre as a building of its own
Six inverters, three over three: six blue Victron MultiPlus inverters arranged three over three on a white plant-room wall above a row of BYD battery cabinets
Six inverters, three over three
The pergola energy centre: a bioclimatic pergola dining terrace
Pratic Connect · concept The pergola energy centre
Commissioning the container: an engineer in hi-vis and hard hat working on the switchboard inside a containerised battery unit
Commissioning the container
Two BYD cabinets at golden hour behind a palisade fence
Industrial Flex 2+1 · 1 MWh Two cabinets, one evening peak
The finished pergola with dining bay and plant bay
How it is built

The frame.

A Pratic Connect bioclimatic pergola — dark bronze aluminium, 3 m clear height, on a 400 mm recessed slab.

The plant rises.

BYD INDUSTRIAL FLEX EFT cabinets: 2,775 mm tall, 1,130 mm wide, 4,000 kg each. Set into the slab so the plinth sits below deck level.

The roof and glass.

Louvres for ventilation on demand; sliding glass for the terrace, sliding mirror for the plant. Both bays read as one object.

1 MWh, furnished.

Two cabinets carry a country-house hotel's evening peak. Add a cabinet per half-megawatt-hour; the footprint grows 1,130 mm at a time.

Mapped to the RIBA Plan of Work

Designed in, not bolted on

One power partner across every stage — so connection, storage and on-site power generation travel with the scheme instead of chasing it.

Stage 0

Strategic Definition

Grid capacity appraisal before commitment: what can this site actually power — and when?

Stage 1

Preparation & Briefing

Load estimation, connection strategy and the energy brief. Book a Zero Fee Site Visit on live schemes.

Stage 2

Concept Design

Energy centre massing and Pratic enclosure concepts — plant footprints that don’t fight the parti.

Stage 3

Spatial Coordination

Coordinated layouts and cable routes; DNO applications lodged with UK Power Connections.

Stage 4

Technical Design

Full system design by Daniel Keeton: Victron and BYD specification, protection studies, G99.

Stage 5

Manufacturing & Construction

Factory-built systems delivered and installed; connection works by UK Power Connections Ltd, a NERS-accredited ICP.

Stage 6

Handover

Commissioning, witness testing, O&M documentation and client training.

Stage 7

Use

Monitoring, service — and the annual savings report your client will thank you for.

Daniel Keeton
Principal Designer

Daniel Keeton

Tekidan

Technical advisor to Victron Energy and BYD on large-scale systems. 350+ installations live across 15 years — including the two largest Victron systems in the UK. Primary designer on every Always Energy project.

Ryan Brady
Grid Connections

Ryan Brady

UK Power Connections

Leads connection and upgrade delivery through our partner UK Power Connections Ltd, a NERS-accredited ICP — DNO to energisation.

David Alner
Founder & Managing Director

David Alner

Always Energy

Your single point of accountability, from first appraisal to twenty years of service.

Three ways to start

Working together
01

Bring us a live scheme

A Zero Fee Site Visit at any RIBA stage: connection route, load, storage, programme risk — with the outcome in writing, within days.

02

Book a call back or visit

We come to your practice or meet on site to go through a scheme: grid constraints, storage and design-led energy centres.

03

Visit West Court Retreat

Stand inside the UK’s largest Victron system. Viewings by appointment.

How we value your work

The design integration fee

Integrating an energy centre into a scheme is real work — coordination, planning consents, client counsel. Our partner programme recognises it with a design integration fee: declared to your client, documented in a simple agreement, with a published schedule by project type. Ask for the one-page summary.

Bring us a live scheme — Book a Zero Fee Site Visit.

What do you provide at RIBA Stage 2?

Drawings of the plant footprint, cable routes, separation distances and the pergola energy centre concept, so the commercial battery storage is designed into the scheme rather than squeezed in later.

How much space does a battery system need?

Each Always node is 650 mm wide and about 2.5 m tall, and gives 20 kW with 30.8 kWh of storage. Nodes sit side by side, so fifteen of them — 300 kW and 462 kWh — make a row under 10 m long.

Can the plant be hidden?

Yes. We house it in a Pratic Connect pergola with mirrored panels, and fit whatever the system needs inside it, so from the garden it reads as architecture, not plant.

Can you meet us to go through a project?

Yes. We can visit your practice or meet on site to go through a scheme with you. Book a call back or a visit from this page.

How do we send you a scheme?

Email the drawings to hello@alwaysenergy.co.uk or use the form on this page. We come back with the footprint, routes and separation for your site.

Questions day or night? Call Ara, our AI assistant – she knows all about our battery storage and systems: 07861 914 115 or 01727 326 026

Who we survey for
Hoteliers General managers Estate directors Leisure centres Spas & thermal suites Architects Large house builders Industrial estates Manufacturers Data centres Councils & public estate Country estates Events venues Hoteliers General managers Estate directors Leisure centres Spas & thermal suites Architects Large house builders Industrial estates Manufacturers Data centres Councils & public estate Country estates Events venues
Processing your request

Sending your details to the team and checking the diary.

Not sent yet
One thing to check

No date pencilled in

When shall we come and see you?

Pick a date from the calendar and we will confirm it by return. If you would rather talk first, we will call you back instead — no visit booked.

Save money Green energy Uninterrupted power Arbitrage Peak shaving Backup power Lower bills
←Back to home
Book a Site Visit

Let's find a time to visit.

A few details and a preferred day — we'll confirm by phone within one working day.

1 / 6 · press Enter to continue
Name
Address
Email
Contact number
November 2026
M
T
W
T
F
S
S
Pencilled in
Nothing yet

See our privacy policy.