EV charging infrastructure
Chargers are the easy part.
The job is the power behind them — capacity, connection, ducting, civils and reinstatement. We manage all of it under one contract, with connection works delivered in partnership with UK Power Connections Ltd, a NERS-accredited ICP.
Questions day or night? Call Ara, our AI assistant – she knows all about our battery storage and systems: 07861 914 115 or 01727 326 026
Every charger question is a capacity question
Start at the substationCount the kilowatts first
Six 22 kW sockets is 132 kW. A row of 50 kW rapids is half a megawatt. Most car parks sit on a supply sized for lighting, a lift and a kettle.
The connection sets the programme
Hardware arrives in weeks. Capacity can take years if it goes through the queue. Which is why we start at the substation, not at the bay.
Civils cost more than chargers
Trenching, ducting, plinths, feeder pillars, reinstatement and traffic management are the bulk of most EV budgets — and the bulk of what goes wrong.
Charger types
Matched to dwell time7 kW AC
Single-phase, 32 ALong stays and overnight: hotel guests, staff who park all day, homes. Adds roughly 25–30 miles of range an hour.
22 kW AC
Three-phase, 32 A per phaseWorkplaces and public car parks. Most cars take 11 kW on AC, so a load-managed rank of 22 kW posts shares a supply well.
50 kW DC rapid
Three-phase supply, DC to the carRetail, hospitality and fleet top-ups. Charges most cars from 20% to 80% in under an hour.
150 kW+ DC ultra-rapid
High-capacity connectionForecourts, charging hubs and depots. Usually needs a new HV connection, a substation or storage behind it.
Survey to switch-on
One managed packageSurvey & load study
Existing supply, spare headroom, cable routes, bay layout and where the power actually has to come from.
Capacity strategy
Upgrade, load-manage or put storage behind the chargers. We price all three before you are committed to one.
Connection or substation
New supply or upgrade delivered with UK Power Connections Ltd, a NERS-accredited ICP, including the substation where the site needs one.
Civils & ducting
Excavation, duct, cable, plinths, feeder pillars, reinstatement and traffic management, managed by us with our own team and specialist subcontractors.
Chargers installed
Units set, terminated, earthed and tested — AC destination sockets through to DC rapids.
Commissioning & handover
Energised, tested, connected to the back office, with O&M records and as-builts you can actually use.
Three ways to power a car park
Priced before you commitMost installers sell you the one they are set up to deliver. We price all three against your actual load profile and show you the twenty-year number.
Upgrade the supply
The base load is genuinely growing, or the site needs rapid charging that no amount of clever control will fit inside the existing supply.
Cost and programme sit with the network operator, and a reinforcement charge is money that never comes back.
Dynamic load management
There is real headroom in the existing supply and most charging happens overnight or across a long dwell time.
Busy periods get throttled. Fine for a workplace, awkward for a forecourt or a depot on a tight turnaround.
Storage-backed charging
Peaks are short and sharp, or capacity is simply capped and an upgrade is priced out of the project.
It needs somewhere to live — but unlike a reinforcement charge, the battery earns for the other twenty-two hours of the day.
Who we build for
Single bays to full rolloutsLocal authorities
On-street and car-park rollouts across multiple sites, phased to a funding programme and delivered without the DNO queue setting the pace.
Workplaces & business parks
Staff and visitor charging with load management so the building keeps working — and metering that bills the right people.
Fleet & depots
Overnight depot charging sized to the duty cycle rather than the brochure, with the connection strategy to match.
Retail & hospitality
Rapids that pay for themselves in dwell time, sited where they earn without wrecking the car park layout.
Housing & developments
Compliance designed in from the substation down, so charging provision is not a variation halfway through the build.
On site
Recent installs
A workplace rank, going in
Charging positions set across an office car park: ducted back to the intake, plinths cast, units landed on the bay line.
Set on the plinth
Fixing a pedestal charger down onto its base with the supply already ducted in behind it — the sequence that keeps a car park open.
Bay by bay
Barriered, dug, backfilled and reinstated a bay at a time, so the site keeps trading while the rank goes in.
A workplace rank, delivered with the car park open
A row of pedestal chargers across a working office car park. We took it from load study to switch-on under one contract, working with our trusted partners on the civils.
- 01Survey and load study of the building’s existing supply
- 02Cable route ducted back to the intake
- 03Concrete plinths cast on the bay line
- 04Pedestal chargers fixed, terminated, earthed and tested
- 05Barriered and reinstated a bay at a time — the car park stayed open
- 06Commissioned and connected to the back office
Tell us how many bays and how fast. We will tell you what the power really costs.
Book a Site Visit→How many chargers can my existing supply take?
Count the kilowatts: six 22 kW posts is 132 kW. Our load study measures the real headroom, then shows whether load management, commercial battery storage or an upgrade is needed.
What is the difference between 7 kW, 22 kW and rapid chargers?
7 kW is single-phase AC for long stays and overnight. 22 kW is three-phase AC for workplaces and car parks. DC rapids from 50 kW charge most cars in under an hour.
Do I need a new grid connection for EV charging?
Not always. There are three routes — upgrade the supply, dynamic load management, or storage-backed charging — and we price all three against your load profile.
Do you do the groundworks as well?
Yes. We manage excavation, ducting, cabling, plinths, feeder pillars, reinstatement and traffic management, using our own team and experienced specialist subcontractors.
Can the car park stay open during the works?
Yes. We barrier, dig, backfill and reinstate a bay at a time so the site keeps trading.
Questions day or night? Call Ara, our AI assistant – she knows all about our battery storage and systems: 07861 914 115 or 01727 326 026
Other services
One managed packageHotels & country estates
Solar battery storage that keeps event days live through power cuts and cuts the bills.
Find out more → 02Architects
RIBA Stage 2 input: footprint, routes, separation and the pergola concept, as drawings.
Find out more → 03Grid connections & upgrades
New connections and capacity upgrades, delivered in partnership with UK Power Connections Ltd, a NERS-accredited ICP.
Find out more →