How many chargers can my existing supply take?
Count the kilowatts: six 22 kW posts is 132 kW. Our load study measures the real headroom, then shows whether load management, commercial battery storage or an upgrade is needed.
What is the difference between 7 kW, 22 kW and rapid chargers?
7 kW is single-phase AC for long stays and overnight. 22 kW is three-phase AC for workplaces and car parks. DC rapids from 50 kW charge most cars in under an hour.
Do I need a new grid connection for EV charging?
Not always. There are three routes — upgrade the supply, dynamic load management, or storage-backed charging — and we price all three against your load profile.
Do you do the groundworks as well?
Yes. We manage excavation, ducting, cabling, plinths, feeder pillars, reinstatement and traffic management, using our own team and experienced specialist subcontractors.
Can the car park stay open during the works?
Yes. We barrier, dig, backfill and reinstate a bay at a time so the site keeps trading.