Timely connections
Contestable works are delivered by UK Power Connections Ltd, a NERS-accredited ICP, so the programme is planned around your build rather than the network operator’s queue.
New connections, capacity upgrades and substations, delivered in partnership with UK Power Connections Ltd, a NERS-accredited ICP, so the contestable works run to your programme rather than the DNO's queue.
Questions day or night? Call Ara, our AI assistant – she knows all about our battery storage and systems: 07861 914 115 or 01727 326 026
A connection offer can arrive with a reinforcement bill attached and an energisation date years out. By then the scheme is committed and the date is somebody else’s to give.
Sites are held up by kVA rather than planning. Heat pumps, charging and all-electric plant have doubled the load on supplies sized for gas-era buildings.
The network operator, the M&E consultant and the groundworker each hold part of the connection. The gaps between them are where the months go.
Most of a connection is contestable — meaning you do not have to have the network operator do it. That single fact is where the time and the money are.
Single plots through to multi-megawatt industrial supplies: design, application, contestable works and energisation.
More kVA into an existing site — new transformer, new incoming cable, or a whole new substation where the old one is maxed out.
Lodged, chased and challenged. Budget estimates, formal offers, point-of-connection negotiation and the technical interface, all handled.
Packaged and GRP substations, ring main units and transformers — specified, delivered, installed and commissioned to adoption standard.
11 kV pulls, terminations and joints by UK Power Connections’ jointers, coordinated by us, so you have one point of contact.
CT chambers, metering positions and cut-outs coordinated with the supplier, so the meter is there when the power is.
Cables in the way of the build, moved. Redundant supplies made safe, disconnected and removed.
Everything upstream of the charger — and the charger too. Local authority rollouts, workplaces, depots and rapids.
Contestable works are delivered by UK Power Connections Ltd, a NERS-accredited ICP, so the programme is planned around your build rather than the network operator’s queue.
Rigorous value engineering on every scope and a shorter programme. Both come off the bill, and the second one comes off your finance costs.
Survey to energisation under a single contract, including coordination of the non-contestable works the DNO must still do.
Custom network design and installation techniques built around the scope in front of us, not a standard template applied to it.
Not every capacity problem needs a bigger connection. Where the load is peaky — charging, kitchens, chillers, machinery starting — a commercial battery storage system sitting behind the existing supply can carry the peak and leave the connection alone.
We appraise both routes side by side and tell you which is cheaper over twenty years, not just this year. That is the whole reason a connections business and an energy business sit under one roof.
See how the storage works→
Making off 11 kV terminations into a ring main unit, by UK Power Connections’ jointers.
An RMU and packaged transformer set in a new substation compound, glands made off and earthed before anything is energised.
Heat-shrink boots over the HV terminations on a new ground-mounted transformer — phase-marked, torqued and tested before the covers go on.
The finished HV side of a new substation: cable dressed up through the gland plate and terminated to the bushings, in a compound barely wider than the unit.
Sand-bedded cable with warning tape over the full run — the unglamorous detail that stops a spade finding it in five years.
A cable route through a live high street: winch set, trench boarded, footway kept open and reinstated to specification.
Half a tonne of transformer landed behind a housing scheme, terminated and labelled where a lorry could barely reach.
Tell us the site and the load. We come back with the likely point of connection, the likely cost and the likely programme — in writing, after a Zero Fee Site Visit.
Network design drawn up and the application lodged, with the budget estimate or formal offer chased to a date rather than left to arrive.
We read the offer properly: what is contestable, what can be redesigned, what can come off the price. Then we tell you what we would do.
UKPC’s teams cut, duct, lay, joint and install — traffic management, civils and reinstatement included, on your programme.
Non-contestable works coordinated with the operator, connection made, metering in, power on.
Assets adopted by the DNO or an IDNO, records and as-builts handed over — and a number you can still ring afterwards.
Ryan has spent over a decade delivering connection works across the UK — from phased residential energisation to major industrial upgrades — with more than five hundred connections behind him. On an Always Energy project he is not a subcontractor you never meet; he is the engineer who designs the connection and stands on site while it is made.
“Simplify the connection process through direct accountability and technical excellence.”
An Independent Connection Provider designs and builds the contestable parts of a new connection, which the DNO or an IDNO then adopts. Our connection works are designed and delivered by our partner UK Power Connections Ltd, a NERS-accredited ICP.
Programme and price. Contestable works run to your timetable at a competitive price, and we manage the whole package — civils, cabling, jointing and the substation — with the connection works delivered by UK Power Connections Ltd, a NERS-accredited ICP.
Contestable work can be built by an accredited ICP: trenching, ducting, cable laying, jointing and substations. Non-contestable work stays with the network operator — mainly the final connection to the live network and its approvals.
It depends on where the capacity is. A Zero Fee Site Visit gives you the likely point of connection, cost and programme in writing before you spend anything.
Often. A battery covers short peaks so the site stays inside its existing supply. We price it side by side with the upgrade so you can compare.
Questions day or night? Call Ara, our AI assistant – she knows all about our battery storage and systems: 07861 914 115 or 01727 326 026
Solar battery storage that keeps event days live through power cuts and cuts the bills.
Find out more → 02RIBA Stage 2 input: footprint, routes, separation and the pergola concept, as drawings.
Find out more → 04Chargers, civils and the power behind them, from one bay to a full rollout.
Find out more →Sending your details to the team and checking the diary.
Pick a date from the calendar and we will confirm it by return. If you would rather talk first, we will call you back instead — no visit booked.
A few details and a preferred day — we'll confirm by phone within one working day.