Skip to content Client loginLogin
Speak to Ara 07861 914 115
Book a Site Visit Call David 07762 240783

Grid connections & capacity upgrades

New substation compound for a commercial grid connection
←
Grid connections & upgrades

The grid is the long pole. We shorten it.

New connections, capacity upgrades and substations, delivered in partnership with UK Power Connections Ltd, a NERS-accredited ICP, so the contestable works run to your programme rather than the DNO's queue.

Questions day or night? Call Ara, our AI assistant – she knows all about our battery storage and systems: 07861 914 115 or 01727 326 026

01

The offer lands and the programme changes

A connection offer can arrive with a reinforcement bill attached and an energisation date years out. By then the scheme is committed and the date is somebody else’s to give.

02

Capacity, not consent, is the constraint

Sites are held up by kVA rather than planning. Heat pumps, charging and all-electric plant have doubled the load on supplies sized for gas-era buildings.

03

Nobody owns the interface

The network operator, the M&E consultant and the groundworker each hold part of the connection. The gaps between them are where the months go.

Most of a connection is contestable — meaning you do not have to have the network operator do it. That single fact is where the time and the money are.

DNO direct
With our ICP partner, UKPC
Who designs it
The network operator’s design team, in their queue
UKPC’s NERS-accredited designers, to adoption standard
Who digs and joints
The DNO or their framework contractor
UKPC’s civils and jointing teams
Programme
Set by their workload, not your build
Planned around your build programme
Cost
A fixed offer — take it or leave it
Value-engineered and competitively priced
Point of contact
A reference number
Ryan Brady, direct
Who owns the asset
The DNO
DNO or IDNO adoption — your choice

What we deliver

Full scope, one contract
01

New connections, LV & HV

Single plots through to multi-megawatt industrial supplies: design, application, contestable works and energisation.

02

Capacity upgrades

More kVA into an existing site — new transformer, new incoming cable, or a whole new substation where the old one is maxed out.

03

DNO application management

Lodged, chased and challenged. Budget estimates, formal offers, point-of-connection negotiation and the technical interface, all handled.

04

Substations, supplied & installed

Packaged and GRP substations, ring main units and transformers — specified, delivered, installed and commissioned to adoption standard.

05

HV cabling & jointing

11 kV pulls, terminations and joints by UK Power Connections’ jointers, coordinated by us, so you have one point of contact.

06

Metering & CT chambers

CT chambers, metering positions and cut-outs coordinated with the supplier, so the meter is there when the power is.

07

Diversions & disconnections

Cables in the way of the build, moved. Redundant supplies made safe, disconnected and removed.

08

EV charging infrastructure

Everything upstream of the charger — and the charger too. Local authority rollouts, workplaces, depots and rapids.

Why go through an ICP at all

With UK Power Connections

Timely connections

Contestable works are delivered by UK Power Connections Ltd, a NERS-accredited ICP, so the programme is planned around your build rather than the network operator’s queue.

Cost-effective by design

Rigorous value engineering on every scope and a shorter programme. Both come off the bill, and the second one comes off your finance costs.

One accountable contractor

Survey to energisation under a single contract, including coordination of the non-contestable works the DNO must still do.

Design that fits the site

Custom network design and installation techniques built around the scope in front of us, not a standard template applied to it.

500+
connections delivered by UKPC
10+
years: UKPC in the power sector
UK
Wide coverage

Not every capacity problem needs a bigger connection. Where the load is peaky — charging, kitchens, chillers, machinery starting — a commercial battery storage system sitting behind the existing supply can carry the peak and leave the connection alone.

We appraise both routes side by side and tell you which is cheaper over twenty years, not just this year. That is the whole reason a connections business and an energy business sit under one roof.

See how the storage works→
Peak shaving
A battery carries the short, sharp peak so the existing connection never sees it — often the difference between needing an upgrade and not.
Programme certainty
Storage can be installed in weeks on your side of the meter, with no application, no queue and no reinforcement charge.
It earns the rest of the day
The same asset buys power cheap overnight, covers outages and can trade flexibility — a reinforcement charge only ever costs money.

On site

Our own team, trusted specialists
A Lucy Electric ring main unit and transformer with 11kV terminations part-made in a new substation compound

HV jointing

Making off 11 kV terminations into a ring main unit, by UK Power Connections’ jointers.

A Lucy Electric ring main unit and transformer in a new substation compound

The ring main unit

An RMU and packaged transformer set in a new substation compound, glands made off and earthed before anything is energised.

Red heat-shrink boots over HV terminations on a new ground-mounted transformer

Transformer terminations

Heat-shrink boots over the HV terminations on a new ground-mounted transformer — phase-marked, torqued and tested before the covers go on.

The HV side of a new substation transformer with cables dressed through the gland plate

Set, glanded, ready

The finished HV side of a new substation: cable dressed up through the gland plate and terminated to the bushings, in a compound barely wider than the unit.

Sand-bedded cable in a trench with yellow electric cable warning tape over the run

Bedded and marked

Sand-bedded cable with warning tape over the full run — the unglamorous detail that stops a spade finding it in five years.

A cable route trench with winch and barriers along a live high street

Street works, managed

A cable route through a live high street: winch set, trench boarded, footway kept open and reinstated to specification.

A 540kg transformer with LV terminations installed in a narrow compound behind a building

Craned into a tight compound

Half a tonne of transformer landed behind a housing scheme, terminated and labelled where a lorry could barely reach.

01

Appraisal

Tell us the site and the load. We come back with the likely point of connection, the likely cost and the likely programme — in writing, after a Zero Fee Site Visit.

02

Design & application

Network design drawn up and the application lodged, with the budget estimate or formal offer chased to a date rather than left to arrive.

03

Offer & value engineering

We read the offer properly: what is contestable, what can be redesigned, what can come off the price. Then we tell you what we would do.

04

Contestable works

UKPC’s teams cut, duct, lay, joint and install — traffic management, civils and reinstatement included, on your programme.

05

Energisation

Non-contestable works coordinated with the operator, connection made, metering in, power on.

06

Adoption & aftercare

Assets adopted by the DNO or an IDNO, records and as-builts handed over — and a number you can still ring afterwards.

Delivered with UK Power Connections

Ryan Brady leads every connection.

Owner & Lead Engineer, UK Power Connections Ltd (a NERS-accredited ICP)

Ryan has spent over a decade delivering connection works across the UK — from phased residential energisation to major industrial upgrades — with more than five hundred connections behind him. On an Always Energy project he is not a subcontractor you never meet; he is the engineer who designs the connection and stands on site while it is made.

“Simplify the connection process through direct accountability and technical excellence.”

Send us the site and the load — you will have a connection appraisal in writing within days.

Book a connection appraisal→
Next

EV charging infrastructure

Chargers & the power behind them→
What is an ICP?

An Independent Connection Provider designs and builds the contestable parts of a new connection, which the DNO or an IDNO then adopts. Our connection works are designed and delivered by our partner UK Power Connections Ltd, a NERS-accredited ICP.

Why use an ICP instead of the network operator?

Programme and price. Contestable works run to your timetable at a competitive price, and we manage the whole package — civils, cabling, jointing and the substation — with the connection works delivered by UK Power Connections Ltd, a NERS-accredited ICP.

What is the difference between contestable and non-contestable work?

Contestable work can be built by an accredited ICP: trenching, ducting, cable laying, jointing and substations. Non-contestable work stays with the network operator — mainly the final connection to the live network and its approvals.

How long does a new connection take?

It depends on where the capacity is. A Zero Fee Site Visit gives you the likely point of connection, cost and programme in writing before you spend anything.

Can battery storage avoid a capacity upgrade?

Often. A battery covers short peaks so the site stays inside its existing supply. We price it side by side with the upgrade so you can compare.

Questions day or night? Call Ara, our AI assistant – she knows all about our battery storage and systems: 07861 914 115 or 01727 326 026

Who we survey for
Hoteliers General managers Estate directors Leisure centres Spas & thermal suites Architects Large house builders Industrial estates Manufacturers Data centres Councils & public estate Country estates Events venues Hoteliers General managers Estate directors Leisure centres Spas & thermal suites Architects Large house builders Industrial estates Manufacturers Data centres Councils & public estate Country estates Events venues
Processing your request

Sending your details to the team and checking the diary.

Not sent yet
One thing to check

No date pencilled in

When shall we come and see you?

Pick a date from the calendar and we will confirm it by return. If you would rather talk first, we will call you back instead — no visit booked.

Save money Green energy Uninterrupted power Arbitrage Peak shaving Backup power Lower bills
←Back to home
Book a Site Visit

Let's find a time to visit.

A few details and a preferred day — we'll confirm by phone within one working day.

1 / 6 · press Enter to continue
Name
Address
Email
Contact number
November 2026
M
T
W
T
F
S
S
Pencilled in
Nothing yet

See our privacy policy.