The offer lands and the programme changes
A connection offer can arrive with a reinforcement bill attached and an energisation date years out. By then the scheme is committed and the date is somebody else’s to give.
Capacity, not consent, is the constraint
Sites are held up by kVA rather than planning. Heat pumps, charging and all-electric plant have doubled the load on supplies sized for gas-era buildings.
Nobody owns the interface
The network operator, the M&E consultant and the groundworker each hold part of the connection. The gaps between them are where the months go.